William Bird Pavilion Redevelopment / New Greens Hub
The Council is taking forward plans to replace the dilapidated changing rooms at William Bird Open Space, Toulmin Drive.
The proposed scheme will bring the former changing facilities together with the community and social spaces currently provided at the New Greens Residents Association, accommodating all current and future user groups under a single and modern facility.
This webpage was last updated on 16 June 2026.
Overview Toggle accordion
The William Bird Pavillion Project forms a key part of the Council’s intention to enhance community infrastructure within the New Greens area of St Albans. Located at William Bird Open Space on Toulmin Drive, the site is an important local asset, accommodating multiple football and rugby pitches that are regularly used by the community and sports clubs.
This project seeks to deliver a modern, accessible and flexible community hub alongside high-quality changing provision compliant with Sport England and relevant governing body standards. The new facility will support a wide range of uses, including sport, community events and social activities, creating a vibrant and inclusive local destination that is accessible to all, including disabled users.
The development will replace the existing pavilion, which was closed in 2022 due to structural issues associated with reinforced autoclaved aerated concrete (RAAC). Temporary facilities have since been installed to enable continued use of the pitches; however, these do not provide a suitable long-term solution. The proposed scheme will deliver a permanent, energy-efficient building, alongside improvements to access, parking and the wider site infrastructure.
As part of the proposals, the existing New Greens Residents’ Association facility at 2 High Oaks, will be demolished, with its users relocating to the new hub once the facility has been built to benefit from improved and more versatile accommodation.
Once vacated, 2 High Oaks - which is outdated, nearing the end of its life, and performs poorly in terms of energy efficiency - will be demolished and replaced with nine new homes for sale on the open market. Crucially, the resulting proceeds will contribute towards funding the new Community Hub.
Initial feasibility work has secured £6.4 million in funding, with contributions expected from a combination of property disposals, section 106 allocations, the 2 High Oaks enabling scheme, and limited borrowing.
The Council is aiming to submit a planning application this summer, with commencing works on site in early 2027. Subject to approval and programme progression, construction will continue through 2027, with completion of the new facility anticipated in spring 2028.
Overall, the Council’s ambition is to deliver a high quality, sustainable facility that meets both sporting and community needs, while enhancing the value and usability of this important green space.
Community Engagement Toggle accordion
Initial engagement took place with the groups below, and further engagement is currently taking place with a range of other stakeholders.
- New Greens Residents Association
- St Albans Centurions (Rugby League Club)
- Herts 1961 Sunday Football League
- St Michael’s Parish Council
- Christ Church St Albans
- Friends of Batch Wood and William Bird Open Space
- New Greens Safer Streets Campaign
A public exhibition is taking place on 30 June at Townsend School from 5pm to 7pm (drop in event) where the latest designs will be showcased and further community feedback sought. Everyone is welcome to come along and find out more.
See the Council's press release here. THIS LINK WILL BE PROVIDED SHORTLY.
Community Feedback Toggle accordion
William Bird Pavilion Development – Stakeholder Requirements Review
| |||
Category | Requirement / Suggestion / Demand | Project Response | Status |
Changing Facilities | Provide gender-neutral and accessible changing facilities | Design reviewed and aligned with Sport England and FA guidance; this includes an accessible changing room and individual changing rooms. | Implementing |
Changing Facilities | Consider separate male and female changing rooms | Gender-neutral approach retained following sports regulator review. By providing separate dedicated male and female changing rooms would reduce the flexibility of the facilities and limits its potential. | Not taken forward |
Changing Facilities | Relocation of changing rooms to the first floor, with community spaces provided at ground floor level. | Sport England and the Football Association require changing facilities to be located at ground floor level. The development is also located within the Green Belt and, together with budget constraints, this limits the ability to significantly increase the ground floor footprint. However, the designs have been revised to have the changing rooms at ground floor level and incorporate community space there too, while keeping the footprint increase to a minimum. | Implemented in part – changing facilities to remain on the ground floor, with community space also incorporated.
|
Toilets | Provide male and female toilet facilities which open into open spaces | Self-contained toilet provision to be maintained. Design to be revised to ensure toilets open into communal spaces. | Agreed in part - design to be reviewed |
Toilets | Provide publicly accessible toilets | The operator will be able to consider providing public access to the toilets as part of their ongoing management of the facility. | Noted – this is an operational arrangement |
Community Space | Ensure building is inclusive and welcoming. | The building is designed to be accessible, inclusive, and welcoming to all users, with the layout carefully planned to support both community and sports activities.
| Noted |
Community Space | Include flexible, partitionable community rooms to support funerals, parties and other events | Multi-use partitionable space is included in the design, with the layouts intended to be as flexible as possible. | Implemented |
Community Space | Provision of meeting/conference rooms and flexible co-working or hot-desking | The purpose of the project is to deliver changing rooms and community space. Space, budget and scope constraints mean working space cannot be provided. There will be flexible rooms available that could be used to hold meetings. | Not taken forward
|
Community Space | Additional floors to accommodate more user groups and fully realise the project’s potential | Adding additional floors to the building would add significant risk to the project with a high likelihood that planning permission would not be achieved. This follows planning advice received about Geen Belt status and proximity to neighbouring properties. In addition, the budget for the project would make this unviable. | Not taken forward
|
External | Improve mobile phone signal and digital connectivity as part of the project | Mobile phone coverage is managed by the network operators and is outside of the scope of this project.
Any approach from network operators to locate mobile phone masts to the building would be considered on a case-by-case basis. | Outside of scope of the project – not taken forward |
External | Provide external electric and water infrastructure source to enable food vans or pop‑up catering on site | Design is under review to assess whether the required infrastructure can be delivered. | Under consideration |
External | Include in the scheme the creation of a play area | The budget currently does not support the inclusion of a play area. The Toulmin Drive play park does provide existing play facilities and is located within walking distance of the site. Should there be a demand for a small play area following completion, then this could be considered later. | Not taken forward (at this time)
|
Kitchen | Incorporate a functional kitchen with flexibility for future catering. | A ground floor kitchen and first floor kitchenette are included within the design. These will be set up to provide a flexible base, allowing the operator to enhance and adapt equipment to suit future catering requirements and evolving uses of the building. | Implemented in part |
Café | Can you include a Café or food and drink provision as a core element? | A kitchen is provided on the ground floor, offering flexibility for the operator to develop a food and drink offer that suits their business model and the needs of the facility. | Implemented in part – this is a decision for the operator |
Café | Provide additional seating for watching football to capture revenue (in conjunction with café/servery). | There are areas around the building that could allow for external seating. This will be kept under review during the landscaping design. | Under review |
External | Additional parking to reduce local impact | An expanded grasscrete car park is included in the design. This will be barrier controlled to increase parking at peak times. | Implemented |
External | Security measures to be included to prevent vehicles accessing pitches or inappropriate areas | This is being assessed, and natural features similar to the existing mound could be used, alongside fencing or bollards. | Under review |
Sustainability | Inclusion of rainwater harvesting system | To be explored at detailed design stage. | Under consideration |
Sustainability | Solar or other renewable measures such as solar canopies and panels. | The inclusion of solar panels and wider sustainability measures will be reviewed at the detailed design stage as part of the energy strategy.
The inclusion of solar canopies has been discounted due to the planning and heritage risks, with the site located within the Green Belt and the adjacent scheduled ancient monument. | Under consideration
Not taken forward
|
Operations | Zoning to allow parts of building to close independently | The building has been designed to allow different areas to operate independently. | Implemented |
Operations | Community-led operating model | The preferred operating model is community-led. The building is being designed to be as flexible as possible to support different approaches to the building’s operation.
While the building design is being progressed through this project, the future operational model will be developed separately and is not being determined at this stage.
| To be reviewed separately |
Frequently Asked Questions Toggle accordion
| William Bird Pavilion Redevelopment FAQs | |
| Why is the Council redeveloping and expanding the William Bird Pavillion? | The existing William Bird Pavilion is an ageing building with an internal layout that no longer works well for modern use. It cannot easily support shared or mixed use by different groups and does not meet current expectations for inclusive and flexible community facilities. The building also contains a reinforced autoclaved aerated concrete (RAAC) roof. Following safety concerns, this has led to the closure of the pavilion, meaning it can no longer be used. Overall, the condition of the building, along with limitations around accessibility, safety, energy efficiency and layout, means it is no longer suitable to meet current or future community needs, and refurbishment is not considered a practical long‑term solution. Redevelopment would allow a new, safe and modern facility to be provided that is accessible, inclusive and better suited to local use. The project also provides an opportunity to bring together community activities currently taking place at the New Greens Residents Association building at 2 High Oaks, located around 650 metres away. That building is nearing the end of its useful life and would require significant investment to keep it suitable for ongoing community use. The proposal would see the pavilion increased in size to accommodate the main activities of the Residents' Association, creating a single, improved facility that can serve a wider range of community and user groups in one location. |
| What structured engagement opportunities are there for people to discuss the project, designs and concerns directly with officers? | The scheme is now progressing towards a more defined design, with key elements largely established. Earlier stages of the project focused on technical assessments, feasibility, safety considerations, and confirming that redevelopment was viable. As the design has matured, attention is now turning to refining specific elements, including internal layouts, fittings, and how the building will operate. This provides a more meaningful basis for engagement, allowing feedback to focus on practical and deliverable aspects of the scheme. Opportunities for engagement will continue as the project moves forward, with input helping to inform these detailed elements. This approach ensures that feedback is constructive, well-informed, and can be properly considered as the final design is developed. In the immediate future, further engagement will take place via an exhibition of the current plans before the end of June and one to one discussions with specific stakeholder groups. |
| Why is the Council building homes for private sale where the existing social club operates rather than developing the community hub in this location? | The project needs to be funded, and the Council has been seeking ways to do that. The proposal to redevelop the William Bird Pavillion is dependent on receiving 100% of the net proceeds raised eventually through the sale of the new houses developed on the site where the existing social club operate (2 High Oaks). The net sale proceeds will off-set a substantial amount of the overall cost to develop the new community hub. Additionally, the site where the existing social club operates is not suitable as the primary purpose of the new facility is to provide changing rooms for the sports clubs. |
What are the project timescales?
| The Council is aiming to submit a planning application this summer, with works commencing on site early 2027. Subject to approval and programme progression, construction will continue through 2027, with completion of the new facility anticipated in spring 2028 |
| How will operational flexibility be maintained if the managing organisation changes in the future? | Operational arrangements for the new building are being reviewed separately from the development project, and a final decision on how the building will be managed will be made outside of the scope of this scheme. This approach ensures that decisions about day‑to‑day operations are not fixed prematurely and can respond to future needs. To maintain flexibility over the long term, the building is being designed to accommodate a range of potential management and operational models. The layout allows different parts of the building to operate independently where required. For example, the changing rooms could function separately from the community spaces, and the community areas could be managed or used in different ways depending on future arrangements. This flexible design approach ensures the building can continue to operate effectively if the managing organisation changes in the future. |
| Is the new centre going to be called "William Bird Pavilion"? | A new name for the combined centre will be needed. For now the existing names for the buildings involved are being used for clarity. Consideration of how the new building will be named should wait until the project is further down the line, but the need is recognised. |
| Community Use & Inclusivity | |
| How will the new pavilion ensure it meets the needs of the whole community, including families, newer residents, and those who do not currently use the social club or sports facilities? | The new William Bird Development is being designed as a flexible, multi-use facility, so it can support a variety of different activities and groups. This flexibility will allow the building to be used by a wide variety of users including those that do not currently use the Residents’ Association or changing rooms. The design focuses on providing inclusive, multi‑purpose spaces that can respond to changing community needs over time. Decisions about day‑to‑day use of the building, programming, and how different groups are brought into the facility will be determined by the future operator through their business and marketing approach, which sits outside the scope of this capital project. |
| What types of activities and uses are being considered for the building during both daytime and evening hours? | The project is not looking to stipulate the activities to be hosted in the new pavilion building (other than ensuring that the current Residents’ Association activities that include live sports viewing, pool, darts, live music, meeting space and hall hire are able to continue); in addition to this the changing facilities for the playing fields will be re-provided. The operator of the building will be responsible for bookings and activities at the facility. |
| How will the building remain welcoming, inclusive, and accessible to all residents? | The building is being designed in accordance with the current building regulations. This includes ensuring the building is accessible and will have step‑free access, accessible toilets and changing facilities, as well as clear internal layouts and flexible spaces. The way the building is programmed, promoted, and managed by the future operator will play an important role in ensuring it remains welcoming and inclusive. |
| Will the new facility include a fit‑for‑purpose kitchen to support community use and events? | The current design includes a full kitchen at ground floor level, with an additional kitchenette provided on the first floor. |
| Will there be daytime, family-friendly uses such as a café or coffee shop? | The building provides flexible spaces to support a range of uses, alongside the kitchen on the ground floor, the rooms can be configured in different ways depending on the operator’s preferred use of the building. |
| Layout, Design & Accessibility | |
| Why are community spaces currently planned for the upper floor, and can the floor plans be swapped so they are on the ground floor? | Community spaces are primarily located on the upper floor because Sport England and Football England guidance requires changing rooms to be provided at ground floor level with direct, level access to the pitches. Locating both uses on the ground floor would significantly increase the building footprint, cost, and planning risk. However, the design has been revised to include community spaces on the ground floor to enable provision of meeting space while maintaining the larger spaces on the first floor. |
| How will the building ensure full accessibility for people with disabilities, including wheelchair access to all areas? | The building will be designed in accordance with current Building Regulations, including measures to ensure it is accessible and inclusive. This will include step‑free access, accessible toilets and changing facilities, a lift, clear internal layouts, and flexible spaces that can be used in a variety of ways. The project team has worked with the Communications and Engagement Team to consider existing disabled user and access groups. Plans will also be made publicly available so that other disabled groups and forums can provide feedback. |
| How will the design ensure the building fits sensitively within the local landscape and surrounding residential area? | A landscape and visual impact assessment will inform the design to minimise effects on the local landscape and nearby homes. The proposals are being refined following pre‑application planning advice and will be considered through the full planning process. |
| How will outdoor areas be designed and managed to balance opportunities for community use with the need to maintain local character, surrounding green space and minimise disturbance? | The Council has appointed a landscape architect to design the outdoor areas to protect the character of the site and surrounding green space, they will look at enhancing biodiversity and retaining the overall green and open feel of the area. Early proposals already reflect this approach, including measures such as the use of permeable surfaces like grasscrete for any additional parking, helping to reduce hard landscaping and maintain the landscape character. The final layout and management arrangements will be carefully considered through the planning process. |
| Will more detailed, clearer or updated plans, visualisations and supporting information be provided to help residents understand the proposals? | Project information will continue to be shared on the Council’s website, including updated plans and visualisations as the design develops. We will also be presenting clearer, more detailed proposals as part of a further engagement event in the near future, giving residents an opportunity to better understand the scheme and how feedback has been considered. |
| Alcohol, Licensing & Safeguarding | |
| What is the justification for including a bar in the proposed scheme? | The inclusion of a bar is intended to retain the social club’s existing facilities and enable them to continue their activities. A bar area helps create a welcoming social space for users, supports events and community activities, and provides income to help cover the ongoing running costs of the facility. This type of provision is common in modern community and sports facilities and is designed to be proportionate and well-managed. |
| How will any proposed licensed or bar use be managed, particularly given the proximity to nearby schools and residential properties? | Any proposal to serve alcohol would require a formal licence application, which would be considered by the Council’s Licensing Committee. This process includes consultation with key stakeholders, and members of the public would have the opportunity to submit comments, similar to the planning process. If approved, the bar would be operated and managed in line with the agreed licence conditions. This typically includes controls over hours of operation, noise management, and responsible supervision to ensure the facility operates appropriately within its setting and minimises any impact on nearby residents and schools. |
| What design, safeguarding and operational measures will be in place to prevent antisocial behaviour and ensure responsible operation of the facility? Particularly in relation to balconies, external access points, and equipment such as solar panels? | The design follows advice from Hertfordshire Constabulary to reduce opportunities for antisocial behaviour, including measures to deter climbing, unauthorised access and vandalism, and to protect features such as balconies and roof equipment. Further input from the police will be incorporated through the planning process. The facility will also be actively managed, with controlled access, supervision and routine maintenance to ensure it remains safe and well-run. |
| Noise, Disturbance & Operational Management | |
| How will potential noise and disturbance from activities, events, and general use be assessed and managed? | A detailed noise assessment will be undertaken to establish appropriate operating measures. This will consider existing background noise levels and potential impacts from activities and equipment. The findings will identify any necessary mitigation, such as enhanced sound insulation, and will inform suitable hours of use and management controls. The assessment will be submitted as part of the planning application. |
| What operational policies (e.g. hours of use, supervision, dispersal) will be put in place to minimise impacts on nearby residents? | The Licensing Committee will consider proposed hours of operation, how the premises will be supervised and managed, arrangements for patrons leaving the site, and how noise and disturbance will be controlled. Conditions are often applied to ensure the facility operates responsibly and minimises impact on nearby residents. |
| Traffic, Access & Safety | |
| What impact will the redevelopment have on traffic levels, parking demand, and road safety in the surrounding area? | The existing car park does not have sufficient capacity to accommodate peak use, particularly on match days. This has led to additional parking pressure on surrounding streets, including Toulmin Drive and Flint Way, with instances of verge parking and occasional obstruction of driveways. The proposals include an expanded overflow car park to help accommodate peak demand and reduce pressure on nearby roads, improving the current situation and supporting safer, more managed parking. The overflow car park will be controlled by a gate and opened during peak periods to manage its use effectively. A transport assessment has been undertaken in preparation for the planning process to consider traffic movements, parking demand and road safety, and appropriate mitigation measures will be incorporated into the design where necessary. |
| How will pedestrian routes, school access, and emergency vehicle access be protected and improved? | The proposals include a new pedestrian link from Townsend School to the new facility, while maintaining existing routes connecting the school to Flint Way and Toulmin Drive. Access arrangements will also be improved, including enhancements to the car park entrance, to support safer pedestrian movement and ensure clear and reliable access for emergency vehicles. |
| Will a transport and access assessment be completed to understand and address these issues? | Yes. A transport and access assessment has been completed, and its findings are being used to inform the design and access arrangements for the scheme. The assessment will be submitted as part of the planning application, and there will be an opportunity for the public and stakeholders to review and comment on it during the planning consultation process. |
| Rationale for Location, Funding & Wider Strategy | |
| Why has this location been chosen for the redevelopment, and how does it fit within the broader strategy for community facilities in New Greens? | The existing changing rooms are in poor condition and require replacement. Their location has been identified within the emerging Local Plan as appropriate for the provision of improved community facilities, including reprovision of the New Greens Residents Association site. The project provides an opportunity to modernise and consolidate facilities in a single location, bringing together a range of community groups and supporting more efficient, sustainable long-term use. |
| How is the project being funded, and how does it represent best value for the community? | Budgetary pressures and interest rate fluctuations in recent years have required the Council to seek alternative funding beyond traditional borrowing. Much of the project funding is derived from a combination of District-wide property disposals and developer’s (Section 106) contributions. The remaining funding will be met through the net proceeds from the sale of privately owned properties proposed for development at 2 High Oaks, along with some borrowing. Alternative options for the William Bird Pavilion were explored, including a like‑for‑like replacement of the existing changing rooms. However, this approach was considered short‑sighted, as it would miss the opportunity to deliver a facility better suited to a wider range of community needs. This is further compounded by the uncertainty arising from the Government’s proposals to replace district councils with larger unitary authorities from March 2028. There is a risk that, If the project does not proceed within the current timescale, it may be delayed for several years or may not progress at all if future funding constraints under a new authority require budget cuts. |
| How will the council ensure the engagement process is transparent, accessible and appropriately structured for a project of this scale? | Now the project has been approved, the project team will be seeking comments from the public during an exhibition which will seek the views on the current proposal. The website will include a record of any recommendations made and rationale for why it has or has not been included, providing an accessible space to retrieve all project information. In addition to this, the standard planning process will enable an opportunity to comment on the application and overall proposal. |
| How will feedback from residents, schools and stakeholders influence the design and future decision-making? | All feedback will be reviewed and assessed to determine if any requirements can be incorporated. Although not all recommendations can be included due to budget and other constraints, the intention is to ensure the new building meets the needs of as many community groups and users as possible. |
| What are the next steps in the engagement and planning process, and how can residents continue to get involved? | The project team encourages you to send over any comments, queries, suggestions to capitalprojects@stalbans.gov.uk A project exhibition is planned for the near future, where the updated proposals will be on display. Once the designs are finalised, a planning application is expected to be submitted in July 2026. |
| What elements of the redevelopment are widely supported, and what concerns have been raised that the project team will address moving forward? | The project overall has been widely supported with few concerns raised about the scheme. A formal pre-application process highlighted local planning authority support as well as general support from key stakeholders and ward councillors. Concerns raised originate from matters that have been addressed in this FAQ such as accessibility, kitchen facilities, security, traffic and noise. Future concerns will be considered and addressed by the project team. |
Concept Visuals Toggle accordion
During our early engagement the Council shared initial visuals and artist's impressions with a range of closely connected local stakeholders.
New visuals and the latest artist's impressions can be seen at the links below. Changes have been made to reflect community feedback received so far.
Next Steps Toggle accordion
A public exhibition is taking place on 30 June at Townsend School from 5pm to 7pm (drop in event) where the latest designs will be showcased and further community feedback sought. Everyone is welcome to come along and find out more.
See the Council's press release here. THIS LINK WILL BE PROVIDED SHORTLY.
Submission of a planning application is anticipated during Summer 2026.
To contact the project team, email capitalprojects@stalbans.gov.uk.